Put Your AD here!

Texas electric grid to be connected to rest of country for first time

Texas electric grid to be connected to rest of country for first time


This article was originally published on Washington times - National. You can read the original article HERE

Texas’ electric grid will be connected to the rest of the nation for the first time through a new privately built transmission line subsidized by federal money.

The Southern Spirit line, which is receiving $360 million of the $1.5 billion in infrastructure funding announced by the Department of Energy Thursday, would connect the Electric Reliability Council of Texas (ERCOT) grid to Louisiana and Mississippi.

The line would help Texas keep the lights on when bad weather knocks out parts of its grid, as happened during February 2021’s winter storms. The storms caused a massive energy failure, with more than 4.5 million customers left without power. Because Texas’ system isn’t connected to the rest of the nation’s power grid, it had difficulty tapping power from other states.



“For a long time, we’ve stared at ERCOT and thought, ‘how can we build more resilience into a system that looks more like an island than an interconnected grid, drawing on the resources in other parts of the country.’ This build-out is really transformational in breaking down the barrier between ERCOT and the rest of the country,” White House National Climate Adviser Ali Zaidi told reporters, according to energy industry publication Power.

Renewable energy company Pattern Energy plans to start construction in 2028 with the line going into service in 2031. It is expected to cost $2.6 billion, would be 320 miles long and would offer 3,000 megawatts of high-voltage, direct current electricity in both directions. 

The line also would continue to keep the ERCOT grid independent of oversight from the Federal Energy Regulatory Commission, Pattern Energy said.

Pattern Energy has acquired about half the land it needs across the three states to start construction, according to the Dallas Morning News. Efforts to get the line built were helped when Louisiana power officials approved the project in August.

This article was originally published by Washington times - National. We only curate news from sources that align with the core values of our intended conservative audience. If you like the news you read here we encourage you to utilize the original sources for even more great news and opinions you can trust!

Read Original Article HERE



YubNub Promo
Header Banner

Comments

  Contact Us
  • Postal Service
    YubNub Digital Media
    361 Patricia Drive
    New Smyrna Beach, FL 32168
  • E-mail
    admin@yubnub.digital
  Follow Us
  About

YubNub! It Means FREEDOM! The Freedom To Experience Your Daily News Intake Without All The Liberal Dribble And Leftist Lunacy!.


Our mission is to provide a healthy and uncensored news environment for conservative audiences that appreciate real, unfiltered news reporting. Our admin team has handpicked only the most reputable and reliable conservative sources that align with our core values.